3 A.M. Problem 7 — for trades, fabrication & job shops

True labour cost

What does that $35/hour worker really cost?

If you only look at wage, your quote is already weak. Labour burden, overhead burden, task-specific burden, shift differential and overtime change what an hour really costs — and what you need to charge to protect profit.

The 30-second answer

True Labour Cost = Wage + SD + LBR + OBR + TSB + OT. Build labour burden from actual payroll burden and overhead burden from the actual P&L and billable production hours, then add task-specific burden, shift differential and overtime when they apply — before the quote goes out.

WageSDLBROBRTSBOT

  • SEE TRUE LABOUR COST CLEARLY

    Know what an hour really costs.

  • QUOTE FROM REAL NUMBERS

    Build estimates from true cost.

  • COMPARE COST VS CHARGE-OUT

    See the gap before you leak profit.

  • KEEP WHAT YOU QUOTED

    Fix the math before the job starts.

Why the usual fixes keep failing

  • 01

    Quoting from wage

    Wage is a payroll number, not the cost of putting an hour on the job.

  • 02

    A rough loaded rate

    Two people at the same wage do not necessarily cost the same.

  • 03

    Generic burden percentages

    A borrowed percentage is a guess dressed up as a number.

  • 04

    Finding out after the start

    Overtime and burden show up after the quote is already out.

Does this sound familiar?

  • You quote from wage or a rough loaded rate.
  • Two people at the same wage do not necessarily cost the same.
  • Overtime and burden show up after the quote is already out.
  • You only find out the labour math was wrong after the job starts.

This is what it's costing you

6 field employees × 160 hours/month × $18 hidden labour-cost gap:

6 × 160 hours × $18 gap

$17,280per month

Illustrative example only — not a measured client result.

Why it keeps happening

The bad-math problem

Wage gets treated like total cost. Labour burden is missing or guessed. Overhead is not turned into a real hourly rate. Task-specific burden, shift differential and overtime get missed. When labour cost is wrong, the quote, the charge-out and the job decisions are wrong too.

What actually has to change

  1. Start with the locked formula: True Labour Cost = Wage + SD + LBR + OBR + TSB + OT.

  2. Build LBR from actual payroll burden, not a generic percentage.

  3. Build OBR from the actual P&L and billable production hours.

  4. Add task-specific burden, shift differential and overtime when they apply.

  5. Use the approved company-average LBR when quoting work where the employee is unknown.

  6. Use the actual employee cost when the work is performed.

  7. Compare the true cost to the charge-out before and during the job.

The PPS + PWP way to know true labour cost before you quote

Profit Pulse System builds the engine. ProjectWatchPRO automates the work.

  1. 1Overhead Guru
  2. 2Labor Analyst
  3. 3Burden Builder
  4. 4Task Architect
  5. 5Bulletproof Quote
  6. 6Schedule Master
  7. 7Pulse Monitor
  8. 8Drift Detector
  9. 9Profit Pulse Loop

Used to build profit defense. Orange steps are the ones this problem depends on.

Why those steps matter here

Overhead Guru
Turn the actual P&L into a real hourly overhead burden rate.
Labor Analyst
Work out what each hour of production actually costs.
Burden Builder
Build labour burden from real payroll burden, not a guess.
Bulletproof Quote
Price above a known cost floor instead of a hoped-for one.

ProjectWatchPRO gives you

  • True Labour Cost by employee, job and task
  • Charge-Out
  • Hours by Job and Task (cost code)
  • Costs vs Charge-Out visibility
  • Labour burden inputs
  • Overhead inputs
  • Employee true-cost view
  • Quote cost visibility

What gets better when you fix this

  • Quotes are built from numbers you can explain.
  • Charge-out rates are set above a known cost floor.
  • You stop buying work with bad labour math.
  • Foremen and owners argue less about the numbers.
  • Margin has a fighting chance before the crew starts.

Will this work here?

We already add a percentage to wage.
A percentage borrowed from somewhere else is not your burden. Build it from your payroll and your P&L.
We do not know the employee at quote time.
Use the approved company-average labour burden rate for quoting, then the actual employee cost when the work is performed.
Our accountant handles this.
Year-end accounting is not an hourly cost floor an estimator can quote from.
This sounds like a lot of setup.
It is done once and maintained — and every quote after that is built on real numbers.

The honest cost of waiting

  1. ~$17,280Next 30 days
  2. ~$34,560Next 60 days
  3. ~$51,840Next 90 days

Based on the illustrative 6-employee example above. Figures are illustrative examples, not documented client results. We replace them with your numbers during the Profit Recovery Review.

Questions owners ask

What is in the true labour cost formula?

Wage + shift differential (SD) + labour burden (LBR) + overhead burden rate (OBR) + task-specific burden (TSB) + overtime premium (OT).

Is wage × 2 close enough?

No. A doubled wage is a guess. Your burden and overhead are specific to your payroll and your P&L.

Which LBR should I quote with?

Use the approved company-average LBR when the future employee is unknown, and the actual employee LBR when the work is performed.

How does this change charge-out?

Charge-out should sit above a known cost floor with the margin you intend to keep — not above a wage.

Let's get the labour math right before you quote.

Run your own numbers through the True Labour Cost Calculator, or book the review and we will build it with you.