Where the money actually goes 07 — page 7 of 8

Extra Work

Unbilled changes are quiet margin killers. Control the changes. Capture the profit.

Extra work always happens. The difference between profit and loss is whether you identify the change early, price it, get the approval, track the time and cost separately, and review what was captured before the invoice goes out.

  • Define and price changes fast

    Create extra work orders in minutes.

  • Get approval before you do it

    Protect your margin before the work starts.

  • Track it like any other work

    See time, materials and costs in real time.

  • Know what you’ve captured — and what you’re missing

    No more leaving money on the table.

The 30-second answer

Extra work always happens. The difference between protecting profit and giving it away is whether the company identifies the change early, prices it, gets the commercial approval, tracks the time, material and cost separately, and reviews what was captured before invoicing.

Profit Drift shows where margin is starting to move. Extra Work addresses one of the most common reasons: added scope gets done without being priced, approved, tracked and billed cleanly.

What it looks like, what it costs, and why it keeps happening

Does this sound familiar?

  • You do extra work, but don’t quote it.
  • Verbal approvals or “we’ll deal with it later.”
  • Extra work gets buried in the original job.
  • You miss costs, time or profit on the change.
  • The crew keeps moving, but the office has to rebuild the story later.
  • The customer asked for one more thing — and now nobody knows whether it was priced or the cost was captured.

This is what it’s costing you

  • Just $10,000 of extra work done
  • without being priced or billed on a $1,250,000 job

$10,000

That is $10,000 of unbilled value at risk — the work was done but never invoiced. If the intended margin on that change was 8%, the lost profit portion is $800 before counting the cost already incurred. Illustrative example, not a client result.

Why the usual way fails

  • Verbal approvals, “we’ll deal with it later,” notes, texts and memory cannot protect margin once the crew has moved on.
  • Approvals happen too late, or not at all.
  • Extra work isn’t tracked separately from the original job.
  • Nobody reviews what was captured before invoicing.
  • The office is forced to reconstruct the change after the field has moved on.

Why it keeps happening

There is no simple repeatable process to identify, price, approve, track and review extra work before invoicing.

  • No clear process to identify and quote changes.
  • Hours and materials get mixed into the original job.
  • The office hears about the change late.
  • Month-end reconstruction replaces a decision made while the work was live.

You can’t bill what you don’t control.

The PPS + PWP way to turn extra work into extra profit

Profit Pulse System builds the engine. ProjectWatchPRO automates the work.

How to fix it

  1. Identify the change early.
  2. Create an extra work order and price it.
  3. Get approval before you start.
  4. Track time, materials and costs separately.
  5. Review what was captured before the invoice is finalized.
  6. Include the approved extra work on the invoice.
  7. Keep the process simple enough that the field and office will actually use it.
  8. Do not rely on memory or month-end reconstruction as the control method.

The 9 steps of Profit Pulse System

  1. 1Overhead Guru
  2. 2Labor Analyst
  3. 3Burden Builder
  4. 4Task Architect
  5. 5Bulletproof Quote
  6. 6Schedule Master
  7. 7Pulse Monitor
  8. 8Drift Detector
  9. 9Profit Pulse Loop

Used to capture the profit. Orange steps are the ones this page depends on.

Step 5 — Bulletproof Quote
Prices the change before it starts — the accepted extra work quote becomes the benchmark.
Step 7 — Pulse Monitor
Keeps the actual time, material and cost visible while the extra work is happening.

ProjectWatchPRO gives you

  • Extra work orders created in minutes.
  • Quoted and accepted extra work kept visible as its own linked sub-project, separate from the original scope.
  • Live tracking of time, materials and costs against the change.
  • Separate reporting for extra work vs original scope.
  • Review of what was captured before the invoice is finalized.
  • Approved extra work carried into billing through the current invoicing workflow.
  • Status and value visibility: what exists, what is approved, what is in progress and what needs attention.
  • A field-friendly mobile view of the extra work order detail.

What gets better when you fix this

  • Nothing slips through the cracks.
  • You protect margin on every change.
  • Bigger profits with the same jobs.
  • Stronger client trust and transparency.
  • Cash flow improves.
  • The office has a cleaner record of what changed, what was captured and what still needs attention.

What you actually see

Live job margin, while the job is still running

Where extra work shows up in the day-to-day view: quoted margin, margin right now, and the hours behind the number. Representative view.

Identify → price → approve → track → review → bill

Extra work runs as a controlled mini-workflow, not a note that gets cleaned up at month-end.

  1. Identify

    Recognize added work before it disappears into the original scope.

  2. Price

    Create the extra work order and put a number on the change.

  3. Approve

    Get the commercial decision before the work starts whenever practical.

  4. Track

    Capture time, materials and costs against the extra work rather than burying them in the original job.

  5. Review

    Confirm what was captured — the value, the cost and what still needs attention.

  6. Bill

    Carry the approved extra work into invoicing using the actual current PWP workflow.

Startable work

How much more could you capture?

Illustrative capture scenario, not a guaranteed recovery. The point is not more paperwork — it is controlling the change while the work is still live.

  • If you capture just $10,000/month of extra work that is properly approved and billed:
  • Next 30 days: ~ $10,000
  • Next 60 days: ~ $20,000
  • Next 90 days: ~ $30,000

How much longer can you afford to wait?

  1. Next 30 days~$10,000
  2. Next 60 days~$20,000
  3. Next 90 days~$30,000

Illustrative pace of capturing $10,000/month of properly approved and billed extra work over the next 30 / 60 / 90 days — not a guaranteed recovery. Figures are illustrative examples, not documented client results. We replace them with your numbers during the Profit Recovery Review.

Questions owners ask

How should contractors handle extra work and change orders?

Price it, get it approved, track its cost separately, and confirm it is on the invoice before the job is billed. Each step is where extra work usually goes missing.

Why does extra work end up unbilled?

The crew does the work to keep the job moving and the paperwork follows later — or not at all. Without a separate record, the cost quietly lands on the original quote.

Should extra work be tracked separately from the base contract?

Yes. Separate tracking is the only way to show what the change actually cost and to defend the invoice if it is questioned.

When should extra work be priced?

While it is live, not at closeout. Approval is far easier to obtain while the reason for the change is still in front of the customer.

Stop leaving money on the table.

Control changes. Capture the profit. Finish stronger. We’ll show you where extra work is slipping through and how to price, track and bill it while the work is still live.

Captured extra work only becomes cash when it is reviewed and invoiced. Next: bill everything that was earned.